Stages of Building a Gunite and Shotcrete Pool
Learn what happens at each step of gunite or shotcrete pool construction, so you can make informed decisions on your custom pool project.
Many homeowners considering a new pool are curious about the process behind gunite and shotcrete pools. Here’s a practical walk-through of each construction stage in the Rocklin, Roseville, and surrounding area.
1. Planning and Permitting
Every custom pool begins with a site evaluation by a seasoned builder. In Rocklin, Roseville, and nearby areas, yard elevations, soil conditions, and city codes drive pool design decisions. Homeowners and builders collaborate to finalize the shape, size, and placement—always considering local regulations and access points.
Your builder manages the permit applications, addressing requirements from city or county authorities. These regulations may differ based on each jurisdiction, so experience dealing with local offices can help keep your project moving. Homeowners need to review plans carefully to ensure their vision is captured.
Once permits are approved, the construction schedule is set. Communication with your builder is essential, as there may be a short wait depending on the season and timelines for other nearby projects.
- Site evaluation is the first step.
- Local codes govern design and placement.
- Permit approval sets the schedule in motion.
See more details about the gunite and shotcrete process on ourGunite and Shotcrete Poolspage.
2. Excavation and Prepping the Site
Excavation is the most visible start of construction. Heavy equipment carefully removes soil according to the pool’s design, shaping shelves, slopes, or benches. In the foothills, rocky soils or slopes sometimes require extra attention to safety and planning.
The process generates a fair amount of noise and dust, and access routes are protected to minimize disruption. In narrow or fenced yards, smaller machinery may be brought in, but this can add to project time. Concrete pools allow design flexibility to handle these local site challenges.
After the main dig, form boards and temporary supports outline the pool’s exact shape. Before moving forward, a city or county inspector typically reviews the site to approve the excavation stage.
- Excavation shapes the pool’s profile.
- Rocky or sloped ground needs extra care.
- Forms are set and city inspections follow.
3. Steel Reinforcement and Plumbing
Every gunite and shotcrete pool relies on a strong steel rebar cage. Skilled crews bend and tie rebar to match every curve, step, and ledge in the pool. This steel skeleton gives the pool its long-term strength and crack resistance.
Plumbing is next. Schedule 40 PVC is used for circulation lines, drainpipes, returns, and water features. Installers set lines to accommodate steps, benches, water features, and future access points. Proper slope and pressure testing are critical to prevent leaks.
Before concrete application can begin, an inspection checks that steel and plumbing are correctly installed. Your builder handles these details and keeps you updated on scheduling and any needed adjustments.
- Steel rebar forms the pool’s frame.
- PVC plumbing is pressure-tested.
- A city inspection is required before concrete work.
| Stage | Duration (typical) | Key Local Decision | Inspection Needed |
|---|---|---|---|
| Planning & Permitting | 1–3 weeks | Pool placement & size | Yes |
| Excavation | 2–5 days | Equipment access, soil | Yes |
| Steel & Plumbing | 2–5 days | Rebar layout for slopes | Yes |
| Gunite/Shotcrete | 1–2 days (plus curing) | Finish prepping | No |
| Finish & Decking | 5–10 days | Surface & deck material | Yes |
4. Gunite or Shotcrete Application
Gunite and shotcrete are both pneumatically applied concrete, but differ in how materials are mixed. Gunite is applied dry-mix, with water added at the nozzle; shotcrete is wet-mix, with all ingredients premixed. Both are popular in the Sacramento region for their durability.
Experienced crews spray the concrete over the rebar cage, shaping the shell by hand. This allows for nearly limitless pool shapes and features. In the Sierra foothills, skilled finishers create durable surfaces to resist our region’s freeze-thaw cycles.
After shaping, the concrete cures for several days. Regular watering or coverings may be recommended to control drying, reducing the risk of cracking and ensuring a strong structure for years to come.
- Gunite = dry-mix; shotcrete = wet-mix.
- Both handle curves and custom features well.
- Curing protects against early cracking.
5. Plumbing, Electrical, and Equipment Installation
With the pool shell complete, crews finish installing plumbing returns, drains, and skimmer lines. Equipment pads are built for pumps, filters, and any water features you’ve chosen. Extra time at this stage pays off in long-term reliability.
Licensed electricians run wiring to code for pool lights, controls, and equipment. Proper electrical work ensures safety and future serviceability. Depending on your site and selections, this may include manual switches or smart automation.
Your builder will test plumbing and equipment under pressure, confirming all systems work before moving to finishes. Homeowners are updated on progress, and questions about equipment operation or future pool care are best handled now.
- Equipment pads set up for pumps/filters.
- Electricians handle all code-compliant wiring.
- Systems are pressure-tested before finishing.
For a look at all your options, visit ourCustom Poolsoverview for design inspiration.
6. Interior Finishes and Coping
The look and feel of your pool is set with an interior finish—options in this region include plaster, exposed aggregate, or pebble surfaces. Each provides durability, color, and texture, with some better suited to high-traffic or shaded areas.
After prepping the shell, crews apply your chosen finish, carefully smoothing for a uniform look. Proper technique at this stage ensures not only aesthetics, but also water-tightness and longevity, especially important in pools exposed to daily use and hot summers.
Coping—the stone or concrete edge that frames your pool—is installed after the interior finish. Your choices here, from classic poured concrete to custom stone, help define the overall look of your backyard.
- Plaster, aggregate, or pebble finishes are popular.
- Finish quality impacts longevity and appearance.
- Coping ties the pool to your patio or hardscape.
7. Decking and Surrounds
With the pool structure finished, attention shifts to the deck and surrounding hardscape. Options in our region include concrete, pavers, or natural stone, chosen for slip resistance, durability, and aesthetics. The transition from pool to patio is a signature element of your design.
Decking is prepped, poured, and tooled to connect seamlessly with your pool coping. Builders also plan for drainage routes based on your yard’s grades, safeguarding your home and landscape through winter storms or heavy irrigation.
Final grading and landscaping tie the whole area together for a functional, inviting outdoor space. Your choices at this stage can add seating, planters, or lighting, blending the pool into the rest of your property.
- Concrete, paver, or stone decks available.
- Drainage design is critical in the foothills.
- Decks integrate with outdoor living zones.
8. Startup and First Fill
Once all building phases pass local inspections, the pool is thoroughly cleaned and filled for the first time. Initial chemical treatments are carefully applied to protect plaster or aggregate finishes as they cure underwater. Proper startup supports surface strength and long-term water clarity.
Your builder will explain daily maintenance and answer questions about pool controls and equipment. This is a hands-on time to learn water testing and chemical basics, so you feel ready to care for your investment through changing seasons.
After the first fill, you and your builder walk the finished pool and surrounding space. Any needed adjustments are made, and you can start enjoying your new backyard retreat with confidence.
- First fill protects new finishes.
- Homeowners trained in equipment and care.
- Inspection and check-off complete the process.
Ready to learn more?Request a consultationwith Marty and the California Hardscapes team.